Construction Scheduling for Site Supervisors

Instructor: Dr. Moe Elbarkouky, Ph.D., P.Eng., PMP, Project Management Training Solutions Ltd. 

Course Duration: One Day

When: Wednesday, November 7, 2018, 8:30 a.m. to 4:30 p.m.

Where: RCA Training Room

Member Cost: $350.00 + GST

Non-Member Cost: $550.00 + GST

Early-bird registrations, received ten (10) days prior to the course date, will receive a reduced rate of $50.00 per full day. 

Early-bird Date: October 28, 2018

Registration Deadline: October 31, 2018

Course Description   One Gold Seal Point 
Site supervisors, coordinators, and trade individuals have a lot to worry about when it comes to planning and controlling their day-to-day project tasks.  They need to prepare their project schedule and assign resources then track project deadlines through proper forecasting and enhanced scheduling tools and techniques.  Construction Scheduling for site supervisors is a one day hands-on training workshop that provides you with essential knowledge and tools to improve your skills and capabilities for proper scheduling and control of the project’s day-to-day tasks.   The course explains the theory and application for project scheduling and control using hands-on training exercises.

Objectives
The objective of this course is to develop the skills and knowledge required to effectively plan, schedule, and control project time, using a case study approach. This course will provide the participants with the essential tools and techniques necessary to effectively plan and control a project schedule. At the end of the day, the participants will be able to immediately apply those project management principles back at work.
 
Learning Goals
Create a step-by-step approach for effective project planning and control to complete multiple project tasks on time.

  • Demonstrate the concepts, techniques, and tools of project planning and scheduling onsite
  • Apply different approaches to develop a proper work breakdown structure, as an essential element of project scheduling and resource allocation
  • Develop a list of project tasks and apply Scheduling Network Diagrams to build a project schedule
  • Learn the basic types of task relationships, lags, leads, and floats.
  • Apply the concept of the critical path method to your project tasks
  • Optimize your schedule using the concepts of resource loading and leveling
  • Establish performance measurement time baselines
  • Improve overall project time tracking functions
  • Apply risk and contingency management tools to your schedule

 

Outline

  • Overview of the project management life cycle and the triple constraints
  • The concept of Project Planning, scheduling and Control
  • Work Breakdown Structure (WBS) as a basis for proper project scoping
  • Project Tasks’ Identification
  • Network scheduling: Precedence diagrams
  • Basic scheduling and network calculations tools
  • Advanced precedence relationships and the critical path method
  • Alternative constraints
  • Gantt and milestone charts
  • Time-phased distribution of costs
  • Cumulative cost curves and Project baseline
  • Updating the project schedule
  • Training exercises and case studies

Instructor’s Information
Dr. Moe Elbarkouky, PhD, PEng., PMP – Project Management Training Solutions LTD
Dr. Elbarkouky is an expert in construction project management and control.   He has more than 20 years of practical experience in his field of practice.  He managed and controlled a large number of complex projects in Canada, the U.S., Europe, Africa, and the Middle East.   He has extensive experience of oil and gas, power plants, infrastructure, and building construction projects.  Dr. Elbarkouky has a Ph.D. in construction engineering and management from the University of Alberta.  He is also a Professional Engineer in Alberta and a Project Management Professional (PMP) of the PMI. He is the CEO of a project management training organization that is specialized in teaching professional and academic courses in project management, risk analysis, contract administration, scheduling, cost estimation, and project planning and control in Alberta, Saskatchewan, BC, and NWT.

To Register Click Here

a1_rent-alls_equipment_logo_Resized_no_bg Silver Sponsor - AON Platinum Sponsor - Boxx Modular Flynn Canada_no_bg Platinum Sponsor - Fries-Tallman Lumber Platinum Sponsor - Graham Platinum Sponsor - Harris Rebar Herc Rental White inland Platinum Sponsor - Ledcor Group nufab Gold Sponsor - PCL Platinum Sponsor - Raven Roofing Platinum Sponsor - SCSA SECURITY 2 COL LOGO - 300_150_converted SVI_no_bg Platinum Sponsor - Steinhubls Trans Canada Contracting (002)_13 WSC_no_bg_2 Platinum Sponsor - Westridge Construction All-rite_logo ardel_steel_resized_no_bg Brock White_no_bg rsz_co-op_logo_no_bg Gold Sponsor - Hipperson Construction rsz_kincaid30_2016_resized_no_bg Lafarge_logotype_rgb_Resized_no_bg Gold Sponsor - Quorex Sasktel_300_150_2018 Gold Sponsor - SGI Logo - Logo_07_no_bg Gold Sponsor - Wallace Silver Sponsor - Wingert Construction allied-printers-logo_Resized_no_bg Certa LogoOval - 13 cindercretelogo clearlite glass_no_bg srma_-_golf_logo_Resized_no_bg Silver Sponsor - CP Distributors eecol-logo-blue Platinum Sponsor - Gang-Nail Trusses harvard-western-insurance mcelhanneylogo_ver_cmyk_Resized_no_bg qcexcavating_logo resized_no_bg roofmart Saskatchwan Apprenticeship and Trade Commission White 2 site_mgmt_logo_resized_no_bg Tymark White Silver Sponsor - Wappel Construction Wolseley Canada White Silver Sponsor - Wood Cogger