Select |
Quantity |
Document |
Description |
Member |
Non Member |
|
|
CCA 1 – 2021: Stipulated Price Subcontract: Electronic |
Standard subcontract form between prime contractor and subcontractor where payment is based on a stipulated or fixed price.
Users can choose between the refer-by-reference or standalone approaches simply by completing either page 2A or 2B (not both) and discarding the other page. |
$74.00 |
$111.00 |
|
|
CCA 1 – 2021: Stipulated Price Subcontract: Seals |
See above |
$12.00 |
$18.00 |
|
|
CCA 16 – 1992: Guidelines for Determining the Costs Associated with Performing Changes in the Work: Electronic |
A guide outlining a change-order checklist. Includes a model change-order quotation form. |
$24.00 |
$36.00 |
|
|
CCA 16 – 1992: Guidelines for Determining the Costs Associated with Performing Changes in the Work: Hardcopy |
See above. |
$3.00 |
$4.00 |
|
|
CCA 19 – 2011: Stipulated Price Sub-subcontract: Electronic |
Standard sub-subcontract form between subcontractor and sub-subcontractor where payment is based on a stipulated or fixed price. Users can choose between the refer-by-reference or standalone approaches simply by completing either page 2 or 3 (not both) and discarding the other page. |
$70.00 |
$105.00 |
|
|
CCA 19 – 2011: Stipulated Price Sub-subcontract: Seals |
See above. |
$11.00 |
$16.50 |
|
|
CCA 25 – 2001: Guide to Project Management Services: Electronic |
A guide outlining the project management concept and describing the project manager’s role and standard of performance in managing a project from conception through design to construction and commissioning. |
$26.00 |
$39.00 |
|
|
CCA 25 – 2001: Guide to Project Management Services: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 26 – 2016: A Guide to the Construction Management Project Delivery Method: Electronic |
A guide explaining what Construction Management is and the two fundamentally different forms of Construction Management contracts: “for Services” and “for Services and Construction”. |
$26.00 |
$39.00 |
|
|
CCA 26 – 2016: A Guide to the Construction Management Project Delivery Method: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 27 – 1997: Guide on Construction Environmental Management Planning: Electronic |
A guide outlining sound environmental practices in the construction industry. It serves to assist contractors in developing an Environmental Management Program. |
$26.00 |
$39.00 |
|
|
CCA 27 – 1997: Guide on Construction Environmental Management Planning: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 28 – 2009: Guide to Improving Cash Flow in the Construction Industry: Electronic |
A guide identifying where cash flow problems generally occur in a construction project and suggesting possible solutions. |
$26.00 |
$39.00 |
|
|
CCA 28 – 2009: Guide to Improving Cash Flow in the Construction Industry: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 50 – 2003: A Prime Contractor’s Guide to Project Financing and Payment Security: Electronic |
CCA 50 offers detailed guidance to prime contractors on understanding their client’s financial strength and how they are financing your project. This guide shows how a prime contractor can minimize the risk of non-payment prior to bidding on a project, prior to signing a contract, and during the administration of a contract. A financing risk management checklist is also provided to list questions that a prime contractor should ask during the bidding and contracting stages, and types of security available to minimize the risk of non-payment. |
$26.00 |
$39.00 |
|
|
CCA 50 – 2003: A Prime Contractor’s Guide to Project Financing and Payment Security: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 51 – 2008: Guide to Calling Bids and Awarding Subcontracts: Electronic |
A guide recommending best practices in all aspects of the bid calling and award subcontract process. |
$26.00 |
$39.00 |
|
|
CCA 51 – 2008: Guide to Calling Bids and Awarding Subcontracts: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 52 – 2008: Joint Venture Guide: Electronic |
A guide that introduces the concept of a joint venture in commercial construction, outlines the potential advantages and risks, identifies keys to a successful joint venture, and provides a checklist of commercial considerations for a joint venture agreement. |
$26.00 |
$39.00 |
|
|
CCA 52 – 2008: Joint Venture Guide: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 53 – 2016: A Trade Contractor’s Guide and Checklist to Construction Contracts: Electronic |
A guide document outlining certain contractual provisions and other issues which can adversely affect the trade contractor’s rights and obligations. It includes a checklist for Trade Contractors. |
$26.00 |
$39.00 |
|
|
CCA 53 – 2016: A Trade Contractor’s Guide and Checklist to Construction Contracts: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 61 – 2008: Risks of Pre-purchasing Equipment and Materials for Construction Projects: Electronic |
A guide explaining the costs and risks associated with pre-purchasing equipment and materials, which may outweigh any anticipated economic and scheduling advantage. |
$26.00 |
$39.00 |
|
|
CCA 61 – 2008: Risks of Pre-purchasing Equipment and Materials for Construction Projects: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 81 – 2001: A Best Practices Guide to Solid Waste Reduction: Electronic |
Title: A Best Practices Guide to Solid Waste Reduction .
Descriptions: A guide providing an overview of federal, provincial and municipal waste guidelines and the CCA’s Waste Management Code of Practice. |
$26.00 |
$39.00 |
|
|
CCA 81 – 2001: A Best Practices Guide to Solid Waste Reduction: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 83 – 2004: Environmental Best Practices Guide for Hot Mix Asphalt Plants: Electronic |
A guide providing owners and operators of hot mix asphalt plants with information and guidance related to the management of their plant assets in a more sustainable and environmentally-friendly fashion. The guide contains checklists that owners can use to improve their plant’s environmental performance. |
$26.00 |
$39.00 |
|
|
CCA 83 – 2004: Environmental Best Practices Guide for Hot Mix Asphalt Plants: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA 90 – 2007: Guidelines for Electronic Procurement: Electronic |
A guide document offering the value and benefits of electronic procurement. It identifies the key issues and recommended “best practices” for the process. |
$26.00 |
$39.00 |
|
|
CCA 90 – 2007: Guidelines for Electronic Procurement: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
Guide – 1993: Recommended Guidelines for Provisioning Geotechnical Information in Construction Contracts: Electronic |
A guide jointly developed with the Association of Consulting Engineers of Canada to assist owners, consultants and contractors in overcoming problems associated with geotechnical information provided in construction contracts. |
$26.00 |
$39.00 |
|
|
Guide – 1993: Recommended Guidelines for Provisioning Geotechnical Information in Construction Contracts: Hardcopy |
See above. |
$29.00 |
$40.00 |
|
|
CCA Human Resources Toolkit - 2010: A Guide to Leadership in the Construction Industry: Hardcopy |
Designed to provide employers in the construction industry with practical guidance on human resources related issues, this toolkit includes explanations of key concepts, templates, and case studies. It contains modules on workforce planning, recruitment and selection, workforce engagement and performance, and a prescription for leading in changing times.
The purchase of this hardcopy toolkit includes access to download over 50 forms and templates relating to finance and administration, health and safety, conduct and discipline, employment, strategic planning, and promoting careers in construction.
|
$92.00 |
$138.00 |
|
|
Complete Set: Electronic |
Complete set of all documents in Electronic form. |
$357.00 |
$367.00 |
|
|
Complete Set: Hardcopy |
Complete set of all documents in Hardcopy form. |
$480.00 |
$720.00 |
|
|
: Electronic |
Test |
$10.00 |
$10.00 |